Conversion of installation by applying By-passes

Conversion of the plant by applying By-passes with working pressure of 7 bar-valve and safety valve of 10 bar.

Everything was measured and prefabricated in the local workshop to minimise downtime of the plant.

The drip trays under the By-passes are extended to the most critical points of the new situation.

Related cases